Minutes-4-26-2012

From GlueXWiki
Revision as of 18:25, 26 April 2012 by Pentchev (Talk | contribs)

Jump to: navigation, search

April 26, 2012 FDC meeting

Agenda

  1. Final results from the oxygen studies (Lubomir)
  2. Production Construction Tracking (Dave)
    • Production status
    • Third package refurbishment status
    • Third package tests (Lubomir)
  3. Engineering update (Bill)
  4. Electronics update (Chris)
  5. Tests with first package at 126 (Beni)
    • Grounding
  6. Other