Difference between revisions of "Minutes-4-28-2011"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
# Chamber testing
 
# Chamber testing
 
#* Calibration and resolution studies (Simon)  
 
#* Calibration and resolution studies (Simon)  
# Other
+
# Other: talks at the collaboration meeting
  
 
<!--
 
<!--

Revision as of 18:03, 27 April 2011

April 28, 2011 FDC meeting

Agenda

  1. Production (Dave)
    • Status
    • Lessons learned from the first weeks of production
  2. Electronics
    • Status (Fernando,Chris)
    • Preamp settings: gain, dynamic range (Fernando, Beni)
  3. Engineering status (Bill)
  4. Chamber testing
    • Calibration and resolution studies (Simon)
  5. Other: talks at the collaboration meeting