Difference between revisions of "Minutes-4-29-2010"

From GlueXWiki
Jump to: navigation, search
Line 10: Line 10:
 
#* PCB (Kim, Fernando)
 
#* PCB (Kim, Fernando)
 
#* grounding/oscillation tests (Lubomir)
 
#* grounding/oscillation tests (Lubomir)
# Cathode redesign (Roger)  
+
# Cathode redesign (Roger) [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign2.pdf beam hole]
 
# Cosmic tests (Beni)
 
# Cosmic tests (Beni)
 
#* results from the first tests
 
#* results from the first tests

Revision as of 15:50, 28 April 2010

April 29, 2010 FDC meeting


Tentative Agenda

  1. Production space
    • status
    • off-site space planning
  2. Electronics
    • PCB (Kim, Fernando)
    • grounding/oscillation tests (Lubomir)
  3. Cathode redesign (Roger) beam hole
  4. Cosmic tests (Beni)
    • results from the first tests
    • plans
  5. Other
    • talks at the Collaboration meeting