Difference between revisions of "Minutes-4-29-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Production space
 
# Production space
 
#* status  
 
#* status  
#* off-site space planning [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan
+
#* off-site space planning [http://www.jlab.org/Hall-D/detector/fdc/general/BLUECRAB_LAYOUT_08_04_2010.pdf floor plan ]
 
# Electronics  
 
# Electronics  
 
#* PCB (Kim, Fernando)
 
#* PCB (Kim, Fernando)

Revision as of 15:53, 28 April 2010

April 29, 2010 FDC meeting


Tentative Agenda

  1. Production space
  2. Electronics
    • PCB (Kim, Fernando)
    • grounding/oscillation tests (Lubomir)
  3. Cathode redesign (Roger) beam hole
  4. Cosmic tests (Beni)
    • results from the first tests
    • plans
  5. Other
    • talks at the Collaboration meeting