Minutes-4-4-2013

From GlueXWiki
Revision as of 17:15, 3 April 2013 by Pentchev (Talk | contribs) (Created page with "April 4, 2013 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_April_4_2013.xlsx Construction Tracking] (Dave) #* Package...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

April 4, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Package #3 repair
  2. Installation (Lubomir, Bill)
    • Cable installation
    • Plans for practicing at Blue Crab
  3. Engineering (Bill)
    • Cooling system status
  4. Electronics (Chris, Nick)
  5. Tests at EEL126 FDC E-log (Beni)
  6. Other