Difference between revisions of "Minutes-4-7-2011"

From GlueXWiki
Jump to: navigation, search
Line 16: Line 16:
 
# Other
 
# Other
  
<!--
 
  
 
= Minutes =
 
= Minutes =
Line 24: Line 23:
 
== Production ==
 
== Production ==
  
 +
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Final%20Talks/ Final Talks]
 +
 +
<!--
 
- Dave: The first test cathode was finished using a "good" third panel. It will be tensioned nest week. The PC used for tensioning was fixed by the CC. The stringing table is now in the clean room. Some additional fixes on the strongback are needed and will be done separately outside of the clean room.
 
- Dave: The first test cathode was finished using a "good" third panel. It will be tensioned nest week. The PC used for tensioning was fixed by the CC. The stringing table is now in the clean room. Some additional fixes on the strongback are needed and will be done separately outside of the clean room.
  

Revision as of 16:14, 7 April 2011

April 7, 2011 FDC meeting

Agenda

  1. Production
    • Readiness review: preliminary results (Lubomir)
    • Production status (Dave)
  2. Electronics
    • Status (Fernando,Chris)
    • Cathode foil inspection
  3. Engineering
    • Tests with conductive tape (Lubomir, Bill)
    • Status (Bill)
  4. Chamber testing
  5. Other


Minutes

Participants: Bill, Dave, Chris, Simon, Beni, Eugene, and Lubomir.

Production

Final Talks