Difference between revisions of "Minutes-4-7-2011"

From GlueXWiki
Jump to: navigation, search
(Production)
Line 4: Line 4:
  
 
# Production
 
# Production
#* Readiness review: preliminary results (Lubomir)
+
#* Readiness review: [http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Final%20Talks/Hall-D_Readiness_Review_Report.pdf Final Readiness Review Report]
 
#* Production status (Dave)
 
#* Production status (Dave)
 
# Electronics  
 
# Electronics  
Line 24: Line 24:
  
 
- Just before the meeting the review committee send us their final report, linked above to the agenda.
 
- Just before the meeting the review committee send us their final report, linked above to the agenda.
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Final%20Talks/Hall-D_Readiness_Review_Report.pdf Final Readiness Review Report]
+
 
  
 
<!--
 
<!--

Revision as of 16:21, 7 April 2011

April 7, 2011 FDC meeting

Agenda

  1. Production
  2. Electronics
    • Status (Fernando,Chris)
    • Cathode foil inspection
  3. Engineering
    • Tests with conductive tape (Lubomir, Bill)
    • Status (Bill)
  4. Chamber testing
  5. Other


Minutes

Participants: Bill, Dave, Chris, Simon, Beni, Eugene, and Lubomir.

Production

- Just before the meeting the review committee send us their final report, linked above to the agenda.