Difference between revisions of "Minutes-4-8-2010"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
#* requirements, floor plan  
 
#* requirements, floor plan  
 
# Electronics (Fernando)
 
# Electronics (Fernando)
#* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left]
+
#* finalizing PCB design [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
 
#* cable procurement  
 
#* cable procurement  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger)
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/cathode_foil_redesign.pdf redesign], [http://www.jlab.org/Hall-D/detector/fdc/drawings/central_hole_redesign.pdf central hole] (Bill, Roger)

Revision as of 11:04, 8 April 2010

April 8, 2010 FDC meeting


Tentative Agenda

  1. Off-site production space
    • status
    • requirements, floor plan
  2. Electronics (Fernando)
  3. Cathode redesign redesign, central hole (Bill, Roger)
  4. Redesigned frame prototype
    • plans for tests
  5. Full scale prototype (Beni)
    • two-layer HV tests
    • third layer status
    • preparation for cosmics tests
  6. Other