Difference between revisions of "Minutes-4-8-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Off-site production space
 
# Off-site production space
 
#* status
 
#* status
#* requirements, floor plan  
+
#* requirements [http://www.jlab.org/Hall-D/detector/fdc/general/fdc_production_proposed_foorplan.pdf floor plan]
 
# Electronics (Fernando)
 
# Electronics (Fernando)
 
#* finalizing PCB design  [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]
 
#* finalizing PCB design  [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_left.pdf Readout_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVright.pdf HV_right] [http://www.jlab.org/Hall-D/detector/fdc/electronics/HVleft.pdf HV_left] [http://www.jlab.org/Hall-D/detector/fdc/electronics/Readout_right.pdf Readout_right]

Revision as of 13:14, 8 April 2010

April 8, 2010 FDC meeting


Tentative Agenda

  1. Off-site production space
  2. Electronics (Fernando)
  3. Cathode redesign redesign, central hole (Bill, Roger)
  4. Redesigned frame prototype
    • plans for tests
  5. Full scale prototype (Beni)
    • two-layer HV tests
    • third layer status
    • preparation for cosmics tests
  6. Other