Difference between revisions of "Minutes-5-12-2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 14: Line 14:
 
#* Rigid-flex stuffing
 
#* Rigid-flex stuffing
 
# Chamber testing (Beni, Lubomir)
 
# Chamber testing (Beni, Lubomir)
 +
#* Gas system at Blue Crab
 
#* [http://www.jlab.org/Hall-D/detector/fdc/production/equipment_bluecrab.txt Equipment for Blue Crab]
 
#* [http://www.jlab.org/Hall-D/detector/fdc/production/equipment_bluecrab.txt Equipment for Blue Crab]
 
# Other
 
# Other

Revision as of 12:50, 11 May 2011

May 12, 2011 FDC meeting

Agenda

  1. Production
  2. Engineering (Bill)
    • Tooling
    • Package assembly design
    • Other
  3. Electronics (Fernando, Chris)
    • Status
    • Rigid-flex stuffing
  4. Chamber testing (Beni, Lubomir)
  5. Other