Difference between revisions of "Minutes-5-12-2011"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 11: | Line 11: | ||
#* Other | #* Other | ||
# Electronics (Fernando, Chris) | # Electronics (Fernando, Chris) | ||
− | |||
#* Rigid-flex stuffing | #* Rigid-flex stuffing | ||
+ | #* Other | ||
# Chamber testing (Beni, Lubomir) | # Chamber testing (Beni, Lubomir) | ||
#* Gas system at Blue Crab | #* Gas system at Blue Crab |
Revision as of 12:51, 11 May 2011
May 12, 2011 FDC meeting
Agenda
- Production
- Status (Dave)
- Wire tension scan logbook page 565 (Lubomir)
- Engineering (Bill)
- Tooling
- Package assembly design
- Other
- Electronics (Fernando, Chris)
- Rigid-flex stuffing
- Other
- Chamber testing (Beni, Lubomir)
- Gas system at Blue Crab
- Equipment for Blue Crab
- Other