Difference between revisions of "Minutes-5-20-2010"
From GlueXWiki
Line 7: | Line 7: | ||
#* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] | #* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] | ||
# Electronics | # Electronics | ||
− | #* fADC125 | + | #* fADC125 status (Fernando) |
#* PCB status (Kim, Fernando) | #* PCB status (Kim, Fernando) | ||
#* grounding (Fernando, Lubomir) | #* grounding (Fernando, Lubomir) | ||
− | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes] (Bill, Roger) | + | # Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger) |
# Full-scale prototype test results | # Full-scale prototype test results | ||
#* tests with fADC125 (Lubomir) | #* tests with fADC125 (Lubomir) |
Revision as of 15:08, 19 May 2010
May 20, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- Electronics
- fADC125 status (Fernando)
- PCB status (Kim, Fernando)
- grounding (Fernando, Lubomir)
- Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
- Full-scale prototype test results
- tests with fADC125 (Lubomir)
- cosmics tests (Beni)
- Other