# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Full-scale prototype test results
 
# Full-scale prototype test results
#* tests with fADC125 (Lubomir)
+
#* tests with fADC125 [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book]  [http://www.jlab.org/Hall-D/detector/fdc/pictures/fADC125_one_event.pdf one event using fADC125 ] (Lubomir)
 
#* cosmics tests (Beni)
 
#* cosmics tests (Beni)
 
# Other
 
# Other
 
   
 
   
  
<!--
+
 
  
 
= Minutes =
 
= Minutes =
Participants: Bill, Casey, Roger, Eugene, Glenn, Mark, Brian, Fernando, Simon, Beni, Kim, Lubomir
+
Participants: Bill, Mark, Casey, Simon, Eugene, Glenn, Fernando, Beni, Lubomir, and Gerard on the phone
 
+
== Other ==
+
 
+
- We started our discussions from the last point: what work do we have for the summer students. There are several projects related to the UVA equipment for wire stringing: setting up the position measuring system (camera with computer), help in the development of a system for tension measurements. Not exactly related to that, but very important, Bill, Brian and others started discussion what else is needed to use the UVA equipment. We will have more discussions on the next meeting, but for now we will contact UVA to bring the equipment at JLab and store it in room 117.
+
 
+
- There's a possibility to have techs/engineers matrixed from FEL to work on the FDC project. Roger made the point that whenever FEL finds funding for them, they will abandon our project. We have to make sure that their contracts have the clause that they first have to finish their responsibilities for us.
+
 
+
- everybody is encouraged the look at the FDC Collaboration talks linked above
+
 
+
- because of the Collaboration meeting next week we will have no FDC meeting
+
  
 
== Production ==         
 
== Production ==         
  
- The plan is to have the space available starting Sep.1. Bill talked to Rusty and he has contacted two vendors for the clean room and will have a teleconference with them. We discussed also what can be done in 727 B.C. without the clean room if the space there is available before Sep.1.
+
- Bill has given updated drawings with our requirements for the off-site space to Ron Lauze. Ron will work on the infrastructure of that building.
  
- Brian and Mark made estimates for the manpower needed for the different steps in the FDC production. Bill will review the procedures and the numbers. The estimates for some of the procedures are not so certain, either they have never been done or the experience is not so solid.
+
- Bill has reviewed the production planing document linked above. There were several questions regarding the timing of the
  
 +
<!--
 
== Electronics ==
 
== Electronics ==
  

Revision as of 16:50, 20 May 2010

May 20, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Fernando)
    • PCB status (Kim, Fernando)
    • grounding (Fernando, Lubomir)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype test results
  5. Other



Minutes

Participants: Bill, Mark, Casey, Simon, Eugene, Glenn, Fernando, Beni, Lubomir, and Gerard on the phone

Production

- Bill has given updated drawings with our requirements for the off-site space to Ron Lauze. Ron will work on the infrastructure of that building.

- Bill has reviewed the production planing document linked above. There were several questions regarding the timing of the