Difference between revisions of "Minutes-5-20-2010"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Full-scale prototype test results
 
# Full-scale prototype test results
#* tests with fADC125 [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book]  [http://www.jlab.org/Hall-D/detector/fdc/pictures/fADC125_one_event.pdf one event using fADC125 ] (Lubomir)
+
#* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book]; [http://www.jlab.org/Hall-D/detector/fdc/pictures/fADC125_one_event.pdf one event using fADC125 ] (Lubomir)
 
#* cosmics tests (Beni)
 
#* cosmics tests (Beni)
 
# Other
 
# Other

Revision as of 16:52, 20 May 2010

May 20, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Fernando)
    • PCB status (Kim, Fernando)
    • grounding (Fernando, Lubomir)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype test results
  5. Other



Minutes

Participants: Bill, Mark, Casey, Simon, Eugene, Glenn, Fernando, Beni, Lubomir, and Gerard on the phone

Production

- Bill has given updated drawings with our requirements for the off-site space to Ron Lauze. Ron will work on the infrastructure of that building.

- Bill has reviewed the production planing document linked above. There were several questions regarding the timing of the