Difference between revisions of "Minutes-5-26-2011"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
#* Other
 
#* Other
 
# Engineering (Bill)
 
# Engineering (Bill)
#* Pin rail modification [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&action=view&page=567 CMM measurements]
+
#* Pin rail modification: [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&action=view&page=567 CMM measurements]
 
#* Rigid-flex gluing
 
#* Rigid-flex gluing
 
#* Other: encoder, parts/tools for chamber assembly
 
#* Other: encoder, parts/tools for chamber assembly

Revision as of 17:04, 25 May 2011

May 26, 2011 FDC meeting

Agenda

  1. Production (Dave)
    • HVAC status
    • Cathodes
    • Wire planes
    • Other
  2. Engineering (Bill)
    • Pin rail modification: CMM measurements
    • Rigid-flex gluing
    • Other: encoder, parts/tools for chamber assembly
  3. Electronics (Fernando, Chris)
    • Update
    • Package grounding scheme
  4. Chamber testing (Beni)
  5. Other