Difference between revisions of "Minutes-5-27-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 8: Line 8:
 
#* new design one-layer prototype  
 
#* new design one-layer prototype  
 
# Electronics  
 
# Electronics  
#* fADC125 status (Fernando, Gerard)
+
#* fADC125 status (Fernando, Gerard) [http://www.jlab.org/Hall-D/detector/fdc/pictures/one_typ_event_nocorr.pdf raw fADC eevent], [http://www.jlab.org/Hall-D/detector/fdc/pictures/one_typ_event.pdf corrected]
 
#* PCB status (Kim, Fernando)
 
#* PCB status (Kim, Fernando)
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  

Revision as of 13:13, 27 May 2010

May 27, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype test results
  5. Other