Difference between revisions of "Minutes-5-27-2010"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Full-scale prototype test results
 
# Full-scale prototype test results
 +
#* Garfield simulations [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 466] (Simon)
 
#* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 464 and 465] (Lubomir)
 
#* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 464 and 465] (Lubomir)
 
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 458 to 463] (Beni)
 
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 458 to 463] (Beni)
 +
#* re-visiting field configuration (Lubomir)
 
# Other
 
# Other
 
   
 
   

Revision as of 13:17, 27 May 2010

May 27, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype test results
  5. Other