Difference between revisions of "Minutes-5-6-2010"
From GlueXWiki
Line 3: | Line 3: | ||
= Tentative Agenda = | = Tentative Agenda = | ||
− | # Production | + | # Production |
#* 727 B.C. status | #* 727 B.C. status | ||
#* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] | #* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ] |
Revision as of 15:57, 5 May 2010
May 6, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- Electronics
- update on oscillation problem (Fernando)
- possible grounding improvement
- PCB (Kim, Fernando)
- fADC125 test plans (Fernando)
- Cathode redesign status(Roger)
- Cosmic tests (Beni)
- Other
- talks at the Collaboration meeting
- no meeting next week