Difference between revisions of "Minutes-5-6-2010"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
#* PCB (Kim, Fernando)
 
#* PCB (Kim, Fernando)
 
#* fADC125 test plans (Fernando)
 
#* fADC125 test plans (Fernando)
# Cathode redesign status(Roger)  
+
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes] (Bill, Roger)  
 
# Cosmic tests (Beni)
 
# Cosmic tests (Beni)
 
# Other
 
# Other
 +
#* summer students, techs from FEL for FDC work
 
#* talks at the Collaboration meeting
 
#* talks at the Collaboration meeting
 
#* no meeting next week   
 
#* no meeting next week   

Revision as of 11:39, 6 May 2010

May 6, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • update on oscillation problem (Fernando)
    • possible grounding improvement
    • PCB (Kim, Fernando)
    • fADC125 test plans (Fernando)
  3. Cathode redesign Bill's changes (Bill, Roger)
  4. Cosmic tests (Beni)
  5. Other
    • summer students, techs from FEL for FDC work
    • talks at the Collaboration meeting
    • no meeting next week