Minutes-5-9-2013

From GlueXWiki
Revision as of 16:42, 9 May 2013 by Pentchev (Talk | contribs)

Jump to: navigation, search

May 9, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Spare package status
  2. Update on the corrosion test at MePhi (Lubomir)
  3. Installation (Lubomir)
  4. Engineering (Bill)
    • Cooling system test
  5. Electronics (Chris, Nick)
  6. Full electronics tests FDC E-log (Beni)
  7. Other