Difference between revisions of "Minutes-6-10-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 7: Line 7:
 
#* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ]
 
#* [http://www.jlab.org/Hall-D/detector/fdc/procedures/production_plan.docx production planning ]
 
#* wire stringing  
 
#* wire stringing  
#* tension measurements
+
#* tension measurement system
 
# Electronics  
 
# Electronics  
 
#* fADC125 status (Gerard, Fernando)  
 
#* fADC125 status (Gerard, Fernando)  

Revision as of 15:54, 9 June 2010

June 10, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Gerard, Fernando)
    • noise/grounding investigations (Fernando)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype tests
  5. Other