Difference between revisions of "Minutes-6-10-2010"

From GlueXWiki
Jump to: navigation, search
Line 13: Line 13:
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Full-scale prototype tests
 
# Full-scale prototype tests
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 468] (Beni)
+
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 478 - 482] (Beni)
 
#* new tests with fADC125 (Lubomir)
 
#* new tests with fADC125 (Lubomir)
 
# Other
 
# Other

Revision as of 10:39, 10 June 2010

June 10, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Gerard, Fernando)
    • noise/grounding investigations (Fernando)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype tests
  5. Other