Difference between revisions of "Minutes-6-10-2010"

From GlueXWiki
Jump to: navigation, search
Line 17: Line 17:
 
# Other
 
# Other
 
   
 
   
<!--
+
 
  
 
= Minutes =
 
= Minutes =
Participants: Eugene, Bill, Fernando, Glenn, Casey, Mark, Beni, Simon, and Lubomir
+
Participants: Bill, Casey, Glenn, Roger, Beni, Chuck, Fernando, Simon, and Lubomir
  
 
== Production ==         
 
== Production ==         
- Bill informed us that Ron Bartek promised Tim the specifications for the off-site space to be delivered to Rusty
+
- We discussed only the production planning. Bill with the help of Chuck put the cathode production on the FastTrack. When a pdf version will be available it will be linked to the minutes of this meting. The production of one cathode sandwich  (cathode and ground planes) will take about four days with five people: four techs cutting, gluing, stretching the foil and one electrical tech doing the soldering work. The second type of cathode sandwich doesn't have a ground plane which makes it by a half day faster, but if assuming the same time we will have 8 days per chamber layer or for 30 layers, 240 days in total.
Sprouse no later than Friday. There's no full lease of the property yet. Eugene explained us there's a relation between setting up the Blue Crab off-site space and the Hall B one: same people are involved.
+
  
- Bill will take care about creating the production flowchart with Fast Track, based on the above document.
+
<!--
 
+
- Brian will bring the fixtures for the wire stringing from UVA on Monday (06/07) and put them in 126. Mark will find space to store the equipment in F117 and as long as there's more free space there, Bill is ready to start setting up the wire stringing. We will use the first articles of the PCBs and cathode foils to produce the new design prototype. We discussed whether we can do the same with the wire and cathode frames: submit PRs for all the frames and use the first ones for the prototype. Bill is confident that the new design will work and we can submit PRs for all the frames; Eugene and Lubomir are also in favor of such decision but we will re-visit this on the next meeting.
+
  
 
== Electronics ==
 
== Electronics ==

Revision as of 17:38, 10 June 2010

June 10, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Gerard, Fernando)
    • noise/grounding investigations (Fernando)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype tests
  5. Other


Minutes

Participants: Bill, Casey, Glenn, Roger, Beni, Chuck, Fernando, Simon, and Lubomir

Production

- We discussed only the production planning. Bill with the help of Chuck put the cathode production on the FastTrack. When a pdf version will be available it will be linked to the minutes of this meting. The production of one cathode sandwich (cathode and ground planes) will take about four days with five people: four techs cutting, gluing, stretching the foil and one electrical tech doing the soldering work. The second type of cathode sandwich doesn't have a ground plane which makes it by a half day faster, but if assuming the same time we will have 8 days per chamber layer or for 30 layers, 240 days in total.