Difference between revisions of "Minutes-6-2-2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 16: Line 16:
 
# Other
 
# Other
  
<!--
 
  
 
= Minutes =
 
= Minutes =

Revision as of 15:40, 2 June 2011

June 2, 2011 FDC meeting

Agenda

  1. Production (Dave)
    • First chamber assembly
    • Cathodes
    • Wire planes
    • Other
  2. Engineering (Bill)
    • Rigid-flex gluing tool
    • Wire position measurements
    • Other
  3. Electronics update (Chris)
  4. Chamber testing (Beni)
  5. Other


Minutes

Participants: Bill, Dave, Chris, Beni, Glenn and Lubomir.

Short meeting since most of the people are at Blue Crab every day and know what's going on; still we discussed some issues in more detail. For the outside people I added more info about the current status.

Production

- The first stack is being assembled right now. We have, from bottom to top on the assembly fixture: 9 empty cathode frames, end window (1mil mylar) with O-ring, cathode type 3 (0.5mil mylar with holes on the bottom and cathode foil on the top). Casey is putting now the O-ring on the wire plane that will be installed in the package right after the meeting. Then we will put the spacer ring (also ready except for O-rings) and then will put on the top the transparent lexan sheet. Later we will replace it with the second cathode (ready) and the second end window.

- Cathodes: we have the third (type 3) and fourth (type 1) cathodes mechanically ready, waiting for the rigid-flexes, on the fifth cathode (type 3) the mylar will be tensioned today. By tomorrow we will have also the second end window (2mil mylar) ready.

- Wire frames: the second wire frame is being prepared now for stringing. We have also the third wire frame laminated.

Engineering

- Rigid-flex pressing tool: today Bill and Casey did tests using pressure indicator paper. It showed that the issues we had with the un-tinned flexes are due to pressure not being equally applied on all the contacts. With the tinned contacts, due to increased thickness, the pressure was OK for all the test configurations. For the un-tinned contacts they tried several configurations: kapton tape only at one side of the connector (first two cathodes were done in such configuration), kapton tape over the connector, and without kapton tape. The best results were obtained with the kapton tape over the connector. In addition they tested