Difference between revisions of "Minutes-6-24-2010"
From GlueXWiki
Line 12: | Line 12: | ||
# Cathode redesign: finalizing (Roger, Bill) | # Cathode redesign: finalizing (Roger, Bill) | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
− | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 494 - | + | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 494 - 500] (Lubomir) |
#* cosmic tests (Beni) | #* cosmic tests (Beni) | ||
# Other | # Other |
Revision as of 11:55, 24 June 2010
June 24, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- plans for wire stringing in 126 pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- Electronics
- fADC125 status (Gerard, Fernando)
- ground modifications
- Cathode redesign: finalizing (Roger, Bill)
- Full-scale prototype tests
- tests with fADC FDC Log Book, pages 494 - 500 (Lubomir)
- cosmic tests (Beni)
- Other