Minutes-6-28-2012
From GlueXWiki
June 28, 2012 FDC meeting
Agenda
- FDC installation and cable routing (Tom Carstens)
- Production Construction Tracking (Dave)
- Production status
- Other: package transportation, subsystem installations
- Engineering update
- Cooling system
- Electronics update (Chris)
- Cable assignment (Vlad)
- Gas system (Beni)
- Test set-up in 126 (Beni)
- Cathode tests of the first package (Vlad)
- Other