Difference between revisions of "Minutes-6-3-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 13: Line 13:
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Cathode redesign [http://www.jlab.org/Hall-D/detector/fdc/drawings/FoilandAllflex_changes_required.docx Bill's changes proposed on the last meeting] (Bill, Roger)  
 
# Full-scale prototype test results
 
# Full-scale prototype test results
#* Garfield simulations [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 466] (Simon)
 
#* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 467] (Lubomir)
 
 
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 468] (Beni)
 
#* cosmics tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 468] (Beni)
 +
#* tests with fADC125: [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 467] (Lubomir)
 +
#* Garfield simulations [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 466] (Simon)
 
# Other
 
# Other
 
   
 
   

Revision as of 16:20, 2 June 2010

June 3, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • production planning
    • new design one-layer prototype: PCB and cathode PRs, wire stringing fixtures
  2. Electronics
    • fADC125 status (Fernando)
    • PCB status (Kim, Fernando)
    • CAEN HV noise investigations (Fernando)
  3. Cathode redesign Bill's changes proposed on the last meeting (Bill, Roger)
  4. Full-scale prototype test results
  5. Other