Difference between revisions of "Minutes-6-7-2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 2: | Line 2: | ||
= Agenda = | = Agenda = | ||
− | # Swiss schnaps | + | # Swiss schnaps (Beni) |
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Jun_7_2012.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Jun_7_2012.xlsx Construction Tracking] (Dave) | ||
#* Production status | #* Production status |
Revision as of 13:36, 7 June 2012
June 7, 2012 FDC meeting
Agenda
- Swiss schnaps (Beni)
- Production Construction Tracking (Dave)
- Production status
- Fourth package tests (Vlad)
- Engineering update (Bill)
- Electronics update (Chris)
- Gas system (Beni)
- Test set-up in 126 FDC E-log (Beni)
- Other