Difference between revisions of "Minutes-6-9-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 14: Line 14:
 
#* Other
 
#* Other
 
# Electronics (Fernando, Chris)
 
# Electronics (Fernando, Chris)
#* PCB schematic update
+
#* PCB schematics update
 
#* Other
 
#* Other
 
# Chamber testing
 
# Chamber testing

Revision as of 15:32, 8 June 2011

June 2, 2011 FDC meeting

Agenda

  1. Production (Dave)
    • First chamber assembly: HV problem
    • Spacer ring: gas leakage
    • Second set wire frame and cathodes
    • Other
  2. Engineering (Bill)
    • Vacuum chamber
    • Ultrasonic cleaning
    • Rigid-flex gluing tool
    • Other
  3. Electronics (Fernando, Chris)
    • PCB schematics update
    • Other
  4. Chamber testing
    • Wire Position Measurements
  5. Other