Difference between revisions of "Minutes-7-1-2010"
From GlueXWiki
Line 9: | Line 9: | ||
# Cathode redesign: finalizing (Roger, Bill) | # Cathode redesign: finalizing (Roger, Bill) | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
− | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 503] (Lubomir) | + | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdc/tests_full_scale_prototype/DTvsMeanMaxPlusGarfieldOxygen0.1pc.pdf evidence for O2 contamination], [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 503] (Lubomir) |
− | #* oxygen contamination measurements [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme] | + | #* oxygen contamination measurements [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme] |
#* cosmic tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 501 - 502] | #* cosmic tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 501 - 502] | ||
# Other | # Other |
Revision as of 16:39, 1 July 2010
July 1, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- wire frame production plans
- plans for wire stringing in 126
- Cathode redesign: finalizing (Roger, Bill)
- Full-scale prototype tests
- tests with fADC evidence for O2 contamination, FDC Log Book, page 503 (Lubomir)
- oxygen contamination measurements Beni's scheme
- cosmic tests FDC Log Book, pages 501 - 502
- Other