Difference between revisions of "Minutes-7-1-2010"
From GlueXWiki
Line 9: | Line 9: | ||
# Cathode redesign: finalizing (Roger, Bill) | # Cathode redesign: finalizing (Roger, Bill) | ||
# Full-scale prototype tests | # Full-scale prototype tests | ||
− | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, | + | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 503] (Lubomir) |
− | #* oxygen contamination measurements | + | #* oxygen contamination measurements [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 501 - 502] |
#* cosmic tests | #* cosmic tests | ||
# Other | # Other |
Revision as of 15:31, 30 June 2010
July 1, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- wire frame production plans
- plans for wire stringing in 126
- Cathode redesign: finalizing (Roger, Bill)
- Full-scale prototype tests
- tests with fADC FDC Log Book, page 503 (Lubomir)
- oxygen contamination measurements FDC Log Book, pages 501 - 502
- cosmic tests
- Other