Difference between revisions of "Minutes-7-1-2010"
From GlueXWiki
Line 11: | Line 11: | ||
#* tests with fADC [http://www.jlab.org/Hall-D/detector/fdc/tests_full_scale_prototype/DTvsMeanMaxPlusGarfieldOxygen0.1pc.pdf evidence for O2 contamination], [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 503] (Lubomir) | #* tests with fADC [http://www.jlab.org/Hall-D/detector/fdc/tests_full_scale_prototype/DTvsMeanMaxPlusGarfieldOxygen0.1pc.pdf evidence for O2 contamination], [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, page 503] (Lubomir) | ||
#* oxygen contamination measurements [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme] | #* oxygen contamination measurements [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme] | ||
− | #* cosmic tests [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 501 - 502] | + | #* cosmic tests (Lubomir for Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 501 - 502] |
# Other | # Other | ||
<!-- | <!-- | ||
− | + | ||
= Minutes = | = Minutes = | ||
− | Participants: Bill | + | Participants: Bill, Roger, Mark, Simon, Casey, Bob, and Lubomir |
+ | |||
+ | (A relatively short meeting with some of the key players in vacations, still there were some important and useful discussions) | ||
== Production == | == Production == | ||
− | - Bill: the PR for the clean room is in | + | - Bill: the PR for the clean room is awaiting Teresa Danforth's signature (it's a vacation time). Bill placed a PR (that is signed already) for two granite tables with wheels to be delivered directly in 727 B.C. |
+ | |||
+ | - Bill placed a PR for the g10 wire frames (30 pieces); the goal is to have them by middle of September. The template for the rochacell rings will be ready next week. The plan is to have two students (working now with Mark) working on the rochacell. Mark asked where to store the rings. Bill prefers to store them on a flat surface, maybe table. We will look to find some space for storage. Lubomir: today we got 6 more feet in EEL 126 from Hall C. After coordinating with Dave Mack, we rearranged their tables. We will use the extra space also for a new rack for the new gas equipment. | ||
+ | |||
+ | - | ||
- Bill: the cathode production plan is in a good shape: Fast Track procedure will be posted soon. The wire production planing will require more information since we have not done the stringing. Therefore, first we need to start setting up the fixtures from UVA and exercising and then clarify the procedure. | - Bill: the cathode production plan is in a good shape: Fast Track procedure will be posted soon. The wire production planing will require more information since we have not done the stringing. Therefore, first we need to start setting up the fixtures from UVA and exercising and then clarify the procedure. |
Revision as of 17:04, 1 July 2010
July 1, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- wire frame production plans
- plans for wire stringing in 126
- Cathode redesign: finalizing (Roger, Bill)
- Full-scale prototype tests
- tests with fADC evidence for O2 contamination, FDC Log Book, page 503 (Lubomir)
- oxygen contamination measurements Beni's scheme
- cosmic tests (Lubomir for Beni) FDC Log Book, pages 501 - 502
- Other