- Bill: the PR for the clean room is awaiting Teresa Danforth's signature (it's a vacation time). Bill placed a PR (that is signed already) for two granite tables with wheels to be delivered directly in 727 B.C.
+
- Bill: the PR for the clean room is awaiting Teresa Danforth's signature (it's a vacation time). Bill placed a PR (that is signed already) for two granite tables with wheels to be delivered directly in 727 B.C. We will need in total 11
  
 
- Bill placed a PR for the g10 wire frames (30 pieces); the goal is to have them by middle of September. The template for the rochacell rings will be ready next week. The plan is to have two students (working now with Mark) working on the rochacell. Mark asked where to store the rings. Bill prefers to store them on a flat surface, maybe table. We will look to find some space for storage. Lubomir: today we got 6 more feet in EEL 126 from Hall C. After coordinating with Dave Mack, we rearranged their tables. We will use the extra space also for a new rack for the new gas equipment.
 
- Bill placed a PR for the g10 wire frames (30 pieces); the goal is to have them by middle of September. The template for the rochacell rings will be ready next week. The plan is to have two students (working now with Mark) working on the rochacell. Mark asked where to store the rings. Bill prefers to store them on a flat surface, maybe table. We will look to find some space for storage. Lubomir: today we got 6 more feet in EEL 126 from Hall C. After coordinating with Dave Mack, we rearranged their tables. We will use the extra space also for a new rack for the new gas equipment.
  
-  
+
- Bill started working on the wire stringing fixtures. We agree that this work has highest priority right now. Bill discussed the way the wires will be pushed down locally, close to the soldering pads. His idea is to use a diffraction plate with grooves
  
 
- Bill: the cathode production plan is in a good shape: Fast Track procedure will be posted soon. The wire production planing will require more information since we have not done the stringing. Therefore, first we need to start setting up the fixtures from UVA and exercising and then clarify the procedure.  
 
- Bill: the cathode production plan is in a good shape: Fast Track procedure will be posted soon. The wire production planing will require more information since we have not done the stringing. Therefore, first we need to start setting up the fixtures from UVA and exercising and then clarify the procedure.  

Revision as of 17:33, 1 July 2010

July 1, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • wire frame production plans
    • plans for wire stringing in 126
  2. Cathode redesign: finalizing (Roger, Bill)
  3. Full-scale prototype tests
  4. Other