Minutes-7-1-2010

From GlueXWiki
Revision as of 18:00, 1 July 2010 by Pentchev (Talk | contribs)

Jump to: navigation, search

July 1, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • wire frame production plans
    • plans for wire stringing in 126
  2. Cathode redesign: finalizing (Roger, Bill)
  3. Full-scale prototype tests
  4. Other