Line 24: Line 24:
 
- We discussed what else is needed to finish the package installation. We will install plastic manifolds for the gas (instead of the aluminum ones that we have now), and will make also the connections between the cooling manifolds. Important question about the grounding connections. One of the results of the test with the full electronics is that we don't need additional grounding of the wire and cathode frames. According some experts, the connection of the detector to the Hall ground is needed only for safety. In 126 there's no such connection and the noise is low. Therefore, we can have one ground cable for all the packages and it doesn't have to be thick.  
 
- We discussed what else is needed to finish the package installation. We will install plastic manifolds for the gas (instead of the aluminum ones that we have now), and will make also the connections between the cooling manifolds. Important question about the grounding connections. One of the results of the test with the full electronics is that we don't need additional grounding of the wire and cathode frames. According some experts, the connection of the detector to the Hall ground is needed only for safety. In 126 there's no such connection and the noise is low. Therefore, we can have one ground cable for all the packages and it doesn't have to be thick.  
  
- We discussed if we can use 1/4" tubes for the gas inside the solenoid. These tube will fit in the gas manifold. Outside tubes are 1/4".       
+
- We discussed if we can use 1/4" tubes for the gas inside the solenoid. These tubes will fit in the gas manifold. Outside tubes are 1/4".       
  
 
== Electronics ==
 
== Electronics ==
Line 32: Line 32:
 
== Full electronics tests ==
 
== Full electronics tests ==
  
-  
+
- Beni and Vlad did a lot of work recently on the electronics and the detector to make almost all of the channels working now.
  
 
== Other ==
 
== Other ==

Revision as of 16:29, 12 July 2013

July 11, 2013 FDC meeting

Agenda

  1. Production
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Full electronics test FDC E-log (Beni)
    • Pre-amp contact issues (Vlad)
  5. Thick cell results [8],[9],[10], [11](Lubomir, Vlad)
  6. Other