Difference between revisions of "Minutes-7-12-2012"
From GlueXWiki
(Created page with "July 12, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_July_12_2012.xlsx Construction Tracking] (Dave) #* Fourth ...") |
|||
Line 8: | Line 8: | ||
#* Third package preparation | #* Third package preparation | ||
# Engineering update (Bill) | # Engineering update (Bill) | ||
+ | #* Cooling system | ||
# Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick) | # Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick) | ||
# Gas system status (Beni) | # Gas system status (Beni) |
Revision as of 17:40, 11 July 2012
July 12, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Fourth package tests
- Spare wire frames
- First package refurbishment
- Third package preparation
- Engineering update (Bill)
- Cooling system
- Electronics update: PR for the spare PCBs, grounding, other (Chris, Nick)
- Gas system status (Beni)
- Test set-up in 126 (Beni)
- Other