+ | = Minutes = | ||
+ | Participants: Fernando, Bill, Roger, Mark, Bob, and Lubomir (fewer people | ||
+ | because of the trigger meeting at CNU at the same time). | ||
+ | |||
+ | == Production == | ||
+ | |||
+ | - According to Tim, the PR for the clean room is awaiting Claus Rode's signature. | ||
+ | |||
+ | - Long discussion about the production procedures. Bill included in the Fast Track also the wire frame production, the wire stringing, and the testing of | ||
+ | the chamber layers. The file is linked above (as jpeg) and is open for | ||
+ | discussions and improvements. Bill asked Mark to look at the file (with Fast | ||
+ | Track from Tom) and give his comments. 8 technicians will be involved full day | ||
+ | and will produce one layer for 6 days, but realistically we assume 8 days. For | ||
+ | 30 layers it will be 240 working days. In addition, two scientists will | ||
+ | assemble the stack and do HV and cosmics tests. The exact tests are not yet | ||
+ | defined, but the idea is to use all the time available for such tests, but not | ||
+ | more than needed for the layer production. Fernando asked about the cleaning | ||
+ | of the wire frames after soldering and we discussed different options for | ||
+ | ultrasonic cleaning. Fernando wanted to have a flow chart of the production | ||
+ | with dates, so that he knows when the different components are needed for the | ||
+ | production. One of the main unknown is when realistically we can move to the | ||
+ | off-site space and start organizing the production. The plan is to have the | ||
+ | wire frames by 8/24 (first article) and 9/20 (all 30). According to Fernando | ||
+ | we will have the PCBs by 7/19 (first article) and by 8/19 (all). The PR for | ||
+ | the cathode foils will be submitted next week and the timing of their | ||
+ | production is not known yet, but Roger has contacted the company: they can do | ||
+ | the first article by the middle of August (assuming the procurement doesn't | ||
+ | take a lot of time). Using this information, Lubomir will start working on the | ||
+ | flow chart with dates on it. | ||
+ | |||
+ | - Bill explained us his ideas about the wire stringing. He will use the strong-back that is at IUCF. Lubomir will take care of bringing the | ||
+ | strong-back to JLab. The idea is to use tape pads to hold the wires at the | ||
+ | right positions before gluing and soldering them. The wire positions will | ||
+ | adjusted by hands (or with some tool) using the camera. We discussed once more | ||
+ | different options for the tension measurements. | ||
+ | |||
+ | - the templates for the rohacell arcs will be ready next Wednesday. Two students will start cutting the arcs, supervised by Mark. Bill said the most | ||
+ | important is to have the I.D. cut correctly. The arcs will be stored in a box | ||
+ | and then they will start gluing the rings. | ||
+ | |||
+ | == Electronics == | ||
+ | |||
+ | - Fernando: CEM was awarded to produce the PCBs. After getting the first article (two of each) on 7/19, the PCBs will be tested by Fernando within | ||
+ | two weeks before starting the mass production. In parallel, the first boards | ||
+ | will be given to an outside company for stuffing, they will be tested again and | ||
+ | then we will continue with the stuffing of all the boards. | ||
+ | |||
+ | - Lubomir looked with the differential probe at the output (with 18m cable) of the new anode and cathode cards. The dynamic range of the anode cards is | ||
+ | about 2/3 of the range of the cathode cards; according to Fernando this is | ||
+ | normal and comes from the difference in the gains. This explains the cutoff in | ||
+ | the fADC spectra discussed before. | ||
+ | |||
+ | |||
+ | == Cathode redesign == | ||
+ | |||
+ | - Roger is ready with the design, except for a few cosmetic changes. He will send the Gerber files to the company by tomorrow and expects estimations | ||
+ | from the company for 70 cathodes by the middle of the next week. At the same | ||
+ | time he will start the PR paperwork, so that he can submit it as soon as he | ||
+ | gets the quotation from the company. | ||
+ | |||
+ | == Full-scale prototype test results == | ||
+ | |||
+ | - Lubomir showed several Beni's plots, linked above. Based on high statistics cosmic data, the mean ADC, measuring the total charge from the wires, goes | ||
+ | down with the drift time. Same was observed before for the maximum amplitude, | ||
+ | using the fADC data. This can be explained by ~0.1% oxygen contamination. Beni | ||
+ | also did measurements at different, by 20%, gas flow rates, but there's no | ||
+ | visible change in the results. | ||
+ | |||
+ | - To measure the oxygen contamination we need a pump at the end of the oxygen sensor, as discussed last time. The problem is that the pressure there should | ||
+ | not be less than 0.5 atm, according to the documentation of the sensor. Beni | ||
+ | also confirmed this talking to the company. We will look what are the | ||
+ | parameters of the pump that we have. We may need a relieve valve to keep the | ||
+ | pressure there above half atm. | ||
+ | |||
+ | --> |
Revision as of 15:49, 15 July 2010
July 15, 2010 FDC meeting
Tentative Agenda
- Production
- 727 B.C. status
- production planning
- wire stringing design
- rohacell ring production
- Electronics: update (Fernando)
- Engineering
- Cathode foil: update (Roger)
- Cathode frame prototyping
- Full-scale prototype tests
- cosmic test results (Beni) FDC Log Book, pages 505
- oxygen contamination measurements Beni's scheme
- Other