Difference between revisions of "Minutes-7-19-2012"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
 
# Gas system (Beni, Bill)
 
# Gas system (Beni, Bill)
#* [http://www.jlab.org/Hall-D/detector/fdc/general/PipeOutgassing.pdf Pipe outgassing]
+
#* [http://www.jlab.org/Hall-D/detector/fdc/general/PipeOutgassing.pdf Pipe outgassing], [http://www.jlab.org/Hall-D/detector/fdc/general/AgingGasDet.pdf gas detector aiging]
#* [http://www.jlab.org/Hall-D/detector/fdc/general/AgingGasDet.pdf ]
+
 
#* [http://www.jlab.org/Hall-D/detector/fdc/general/GasCompilation.pdf Gas mixture] (Lubomir)
 
#* [http://www.jlab.org/Hall-D/detector/fdc/general/GasCompilation.pdf Gas mixture] (Lubomir)
 
# Test set-up in 126 (Beni)
 
# Test set-up in 126 (Beni)

Revision as of 11:35, 19 July 2012

July 19, 2012 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Fourth package status and spare wire frames (Lubomir, Vlad)
    • Third package preparation
    • Grounding scheme (Vlad)
  2. Engineering (Bill)
  3. Electronics (Chris, Nick)
  4. Gas system (Beni, Bill)
  5. Test set-up in 126 (Beni)
  6. Other