Difference between revisions of "Minutes-7-19-2012"
From GlueXWiki
Line 9: | Line 9: | ||
# Electronics (Chris, Nick) | # Electronics (Chris, Nick) | ||
# Gas system (Beni, Bill) | # Gas system (Beni, Bill) | ||
− | #* [http://www.jlab.org/Hall-D/detector/fdc/general/PipeOutgassing.pdf Pipe outgassing] | + | #* [http://www.jlab.org/Hall-D/detector/fdc/general/PipeOutgassing.pdf Pipe outgassing], [http://www.jlab.org/Hall-D/detector/fdc/general/AgingGasDet.pdf gas detector aiging] |
− | + | ||
#* [http://www.jlab.org/Hall-D/detector/fdc/general/GasCompilation.pdf Gas mixture] (Lubomir) | #* [http://www.jlab.org/Hall-D/detector/fdc/general/GasCompilation.pdf Gas mixture] (Lubomir) | ||
# Test set-up in 126 (Beni) | # Test set-up in 126 (Beni) |
Revision as of 11:35, 19 July 2012
July 19, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Fourth package status and spare wire frames (Lubomir, Vlad)
- Third package preparation
- Grounding scheme (Vlad)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Gas system (Beni, Bill)
- Pipe outgassing, gas detector aiging
- Gas mixture (Lubomir)
- Test set-up in 126 (Beni)
- Other