− | - David Butler accepted the position of FDC Construction Coordinator and will start on Aug. 2. | + | - David Butler accepted the position of a FDC Construction Coordinator and will start on Aug. 2. Both Bill and Lubomir are confident he will do the job. He has expertise in wrking with PCBs which may be helpful for Fernando when testing our PCBs. |
== Production == | == Production == |
Revision as of 22:39, 22 July 2010
July 22, 2010 FDC meeting
Tentative Agenda
- Announcements
- Production
- 727 B.C. status
- production planing: 5 techs production schedule
- Electronics: update (Fernando)
- Engineering
- Cathode foil: update (Roger)
- Wire stringing design (Bill)
- Cathode frame prototyping
- Full-scale prototype tests
- cosmic test results (Beni) FDC Log Book, pages 505
- oxygen contamination measurements Beni's scheme
- Other
Minutes
Participants: Eugene, Bill, Fernando, Glenn, Roger, Casey, Beni, Simon, and Lubomir.