Difference between revisions of "Minutes-7-22-2010"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
# Production
 
# Production
 
#* 727 B.C. status
 
#* 727 B.C. status
#* [http://www.jlab.org/Hall-D/detector/fdc/general/fdc_production_fasttrack.JPG production planning ]
+
#* production planing: [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_production_5techs.pdf 5 techs production schedule]
 
# Electronics: update (Fernando)
 
# Electronics: update (Fernando)
 
# Engineering
 
# Engineering

Revision as of 17:35, 22 July 2010

July 22, 2010 FDC meeting

Tentative Agenda

  1. Announcements
  2. Production
  3. Electronics: update (Fernando)
  4. Engineering
    • Cathode foil: update (Roger)
    • Wire stringing design (Bill)
    • Cathode frame prototyping
  5. Full-scale prototype tests
  6. Other