Difference between revisions of "Minutes-7-22-2010"
From GlueXWiki
Line 6: | Line 6: | ||
# Production | # Production | ||
#* 727 B.C. status | #* 727 B.C. status | ||
− | #* [http://www.jlab.org/Hall-D/detector/fdc/ | + | #* production planing: [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_production_5techs.pdf 5 techs production schedule] |
# Electronics: update (Fernando) | # Electronics: update (Fernando) | ||
# Engineering | # Engineering |
Revision as of 17:35, 22 July 2010
July 22, 2010 FDC meeting
Tentative Agenda
- Announcements
- Production
- 727 B.C. status
- production planing: 5 techs production schedule
- Electronics: update (Fernando)
- Engineering
- Cathode foil: update (Roger)
- Wire stringing design (Bill)
- Cathode frame prototyping
- Full-scale prototype tests
- cosmic test results (Beni) FDC Log Book, pages 505
- oxygen contamination measurements Beni's scheme
- Other