Difference between revisions of "Minutes-7-28-2011"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
#* Wire deadening
 
#* Wire deadening
 
#* Leakage current tests (Lubomir)
 
#* Leakage current tests (Lubomir)
#* Revised short term production schedule  
+
#* Revised short term production [http://www.jlab.org/Hall-D/detector/fdc/procedures/REVISION_FDC_START_PRODUCTION.jpg schedule]
 
# Engineering update (Bill)
 
# Engineering update (Bill)
 
# Electronics update (Chris)
 
# Electronics update (Chris)

Revision as of 12:29, 28 July 2011

July 28, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
    • Leakage current tests (Lubomir)
    • Revised short term production schedule
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
  5. Other