- Dave (see  the construction tracking): Continued with stringing wire frame#4. Wire frame#3 is waiting for soldering second phase component (Chris will do it together with Tina).  Cell#5: one cathode ready, working on the second (type 2) cathode. Cell#6: working on the first cathode.
+
- Dave (see  the construction tracking): Techs are finishing the cathodes for cell#5
  
 
- Waiting for the chemicals for the wire deadening; probably will start testing the procedure beginning of next week. Bill: what is the wire diameter needed to deaden the wire? Lubomir: according to Garfield if we make sense wires 40um signal drops by factor of 40, for 60um - factor of 400, and for 80um -factor of 2,700. After some discussions, Bill will look what is the sagging effect of thickening the wires and Lubomir will estimate the suppression factor that we need.
 
- Waiting for the chemicals for the wire deadening; probably will start testing the procedure beginning of next week. Bill: what is the wire diameter needed to deaden the wire? Lubomir: according to Garfield if we make sense wires 40um signal drops by factor of 40, for 60um - factor of 400, and for 80um -factor of 2,700. After some discussions, Bill will look what is the sagging effect of thickening the wires and Lubomir will estimate the suppression factor that we need.

Revision as of 15:24, 28 July 2011

July 28, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • Wire deadening
    • Leakage current tests (Lubomir)
    • Revised short term production schedule (Lubomir)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
  5. Other