Difference between revisions of "Minutes-7-28-2011"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_July28.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking_July28.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
#* Wire deadening [http://www.jlab.org/Hall-D/detector/fdc/procedures/fdc_calculations4.xml Bill's calculations]
+
#* Wire deadening [http://www.jlab.org/Hall-D/detector/fdc/procedures/fdc_calculations4.xlsx Bill's calculations]
 
#* Leakage current tests (Lubomir)
 
#* Leakage current tests (Lubomir)
 
#* Revised short term production [http://www.jlab.org/Hall-D/detector/fdc/procedures/REVISION_FDC_START_PRODUCTION.jpg schedule] (Lubomir)
 
#* Revised short term production [http://www.jlab.org/Hall-D/detector/fdc/procedures/REVISION_FDC_START_PRODUCTION.jpg schedule] (Lubomir)

Revision as of 15:44, 28 July 2011

July 28, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126 (Beni)
  5. Other