Difference between revisions of "Minutes-7-29-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 3: Line 3:
 
= Tentative Agenda =
 
= Tentative Agenda =
  
# Announcements
 
 
# Production
 
# Production
 
#* 727 B.C. status
 
#* 727 B.C. status
#* production planing: [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_production_5techs.pdf 5 techs production schedule]
+
#* production planing status [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_production_5techs.pdf 5 techs production schedule]
# Electronics: update (Fernando)
+
# Electronics (Fernando)
 +
#* new PCB tests
 +
#* other updates: cable procurement, fADC
 
# Engineering
 
# Engineering
#* Cathode foil: update (Roger)
+
#* Cathode foil procurement (Roger)
#* Wire stringing design (Bill)
+
#* Wire stringing update (Bill)
 
#* Cathode frame prototyping   
 
#* Cathode frame prototyping   
 
# Full-scale prototype tests
 
# Full-scale prototype tests
#* cosmic test results (Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 505]
+
#* discussions about gas mixture and field configuration (Lubomir)
#* oxygen contamination measurements [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme]
+
#* cosmic test update (Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 505]
 +
#* oxygen contamination measurements (Beni) [http://www.jlab.org/Hall-D/software/wiki/index.php/Image:Halld_gas_systemB_v2.gif Beni's scheme]
 
# Other
 
# Other
 +
 +
<!--
 
= Minutes =
 
= Minutes =
 
Participants: Eugene, Bill, Fernando, Glenn, Roger, Casey, Beni, Simon, and Lubomir.
 
Participants: Eugene, Bill, Fernando, Glenn, Roger, Casey, Beni, Simon, and Lubomir.
  
<!--
 
  
 
== Announcements ==
 
== Announcements ==

Revision as of 15:56, 28 July 2010

July 22, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics (Fernando)
    • new PCB tests
    • other updates: cable procurement, fADC
  3. Engineering
    • Cathode foil procurement (Roger)
    • Wire stringing update (Bill)
    • Cathode frame prototyping
  4. Full-scale prototype tests
  5. Other