Difference between revisions of "Minutes-7-29-2010"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
# Engineering
 
# Engineering
 
#* Cathode foil procurement (Roger)
 
#* Cathode foil procurement (Roger)
#* Wire stringing update (Bill); [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg UVA stuff] (38.25")
+
#* Wire stringing update (Bill); UVA stuff: [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup1.jpg 1] (38.25"+0.5"),  [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup2.jpg 2],  [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup3.jpg 3], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/14FinalSetup4.jpg 4] 
 
#* Cathode frame prototyping   
 
#* Cathode frame prototyping   
 
# Full-scale prototype tests
 
# Full-scale prototype tests

Revision as of 16:21, 28 July 2010

July 29, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics (Fernando)
    • new PCB tests
    • other updates: cable procurement, fADC
  3. Engineering
    • Cathode foil procurement (Roger)
    • Wire stringing update (Bill); UVA stuff: 1 (38.25"+0.5"), 2, 3, 4
    • Cathode frame prototyping
  4. Full-scale prototype tests
  5. Other