== DAQ ==
 
== DAQ ==
  
- Beni can read now all the 18 crates (CDC+FDC).  
+
- Beni: can read now all the 18 crates (CDC+FDC). Sometimes DAQ crashes fatally, so that you have to reboot the computer (suspect InfiniBand). Also somehow the bios on gluon51 failed; will be replaced.  
  
 
== CDC noise ==
 
== CDC noise ==
  
Long discussions about the noise (first picture above) on the CDC that Beni studied:
+
- Fernando suspects the noise may come from the CDC itself, since it depends on the HV, and suggested increasing the CO2 content by keeping the same HV; the idea is to exclude the HV modules as a source of the noise. Eugene/Naomi: same effect will be if decrease/increase the HV by few hundred volts. Also it's difficult to explain with gas discharges the correlation we see in the noise (see plots from the last meeting). In any case, first Mike will study systematically where on the CDC we see the noise.
  
- higher noise on higher channel number (Naomi observed the same effect)
+
- Lubomir look with a scope on the FDC and found noise with very similar pattern in some special channels. That was always in cards that have both long and short strips 
 
+
- the noise completely disappears only if the HVB card is disconnected from the detector (last picture)
+
 
+
- the noise reduces gradually by turning off more HV/LV channels but still remains even with the FDC HV also off (second picture)
+
 
+
- no change in the noise with additional HVB shielding or by changing the return/ground connections on the HV modules
+
 
+
More studies needed; Fernando will talk to Cody to use the pulser on the fADC125.
+
  
 
== Electronics ==
 
== Electronics ==

Revision as of 17:09, 3 July 2014

July 3, 2014 FDC+CDC meeting

Agenda

  1. Commissioning plans
  2. Gas system
  3. DAQ (Beni)
  4. CDC status (Beni)
  5. FDC status (Lubomir)
  6. Electronics (Chris, Nick)
  7. Engineering (Bill)
  8. Other

Instructions for Bluejeans meeting connection

FDC meeting ID: 290664653

Minutes

Participants: Naomi (CMU), Beni, Dave, Chris, Mike, Simon, Fernando, Eugene, Glenn, and Lubomir (JLab).

Readiness review

- Drafts (very preliminary) for the CDC and FDC commissioning were prepared for the readiness review (page linked above). For the FDC the plan so far is to use two gas mixtures, 90/10 and 40/60, the first one is better for the alignment. The target position(s) and turning on/off the magnetic field needs to be coordinated.

Gas system

- Last Friday, at ~8am, the power in the gas room was turned off for ~15 min due to a planned electrical work there. After turning it ON, the setting in the gas control panel were wrong (40mA, while the range is 4-20mA). As a result: (1) the flow was doubled and (2) the PLS didn't turned OFF the flow controllers when the mixing tanks reached 12psi. Soon the pressure reached 15psi and the two relief valves were continuously engaged for some time.

- After the meeting we installed an UPS (in preparation for the holiday weekend) there. Dave will contact the company to find a solution, at least to change the default settings to what we need.