Difference between revisions of "Minutes-7-8-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 9: Line 9:
 
#* rohacell ring production
 
#* rohacell ring production
 
# Electronics: update (Fernando)
 
# Electronics: update (Fernando)
# Cathode redesign: finalizing (Roger, Bill)  
+
# Cathode redesign: finalizing (Roger)  
 
# Full-scale prototype tests
 
# Full-scale prototype tests
 
#* cosmic test results (Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 504]
 
#* cosmic test results (Beni) [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 504]

Revision as of 14:45, 7 July 2010

July 8, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • wire frame production planning
    • wire stringing design
    • rohacell ring production
  2. Electronics: update (Fernando)
  3. Cathode redesign: finalizing (Roger)
  4. Full-scale prototype tests
  5. Other