Difference between revisions of "Minutes-7-8-2010"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production
 
# Production
 
#* 727 B.C. status
 
#* 727 B.C. status
#* wire frame production planning
+
#* wire frame [http://www.jlab.org/Hall-D/detector/fdc/general/fdc_production_fasttrack.JPG production planning ]
 
#* wire stringing design
 
#* wire stringing design
 
#* rohacell ring production
 
#* rohacell ring production

Revision as of 11:32, 8 July 2010

July 8, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics: update (Fernando)
  3. Cathode redesign: finalizing (Roger)
  4. Full-scale prototype tests
  5. Other