Difference between revisions of "Minutes-8-16-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "August 16, 2012 FDC meeting = Agenda = # Cathode production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_August_16_2012.xlsx Construction Tracking] (Dave...")
 
Line 4: Line 4:
 
# Cathode production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_August_16_2012.xlsx Construction Tracking] (Dave)
 
# Cathode production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_August_16_2012.xlsx Construction Tracking] (Dave)
 
# Cathode corrosion
 
# Cathode corrosion
#* Status
+
#* Status [http://www.jlab.org/Hall-D/detector/fdc/corrosion/]
 
#* Possible procedure changes
 
#* Possible procedure changes
 
# Conductive tape technology
 
# Conductive tape technology
#* Test results
+
#* Test results [http://www.jlab.org/Hall-D/detector/fdc/conductive_tape/vchamb/]
 
#* Procedure changes
 
#* Procedure changes
 
# Engineering (Bill)
 
# Engineering (Bill)

Revision as of 18:31, 15 August 2012

August 16, 2012 FDC meeting

Agenda

  1. Cathode production Construction Tracking (Dave)
  2. Cathode corrosion
    • Status [1]
    • Possible procedure changes
  3. Conductive tape technology
    • Test results [2]
    • Procedure changes
  4. Engineering (Bill)
    • Cathode strong-back
    • Other: epoxy tests
  5. Electronics (Chris, Nick)
    • PCBs
  6. TDR, pages 132-145 (Lubomir)
  7. Other