Difference between revisions of "Minutes-8-16-2012"

From GlueXWiki
Jump to: navigation, search
Line 7: Line 7:
 
#* Possible procedure changes
 
#* Possible procedure changes
 
# Conductive tape technology
 
# Conductive tape technology
#* Test results [http://www.jlab.org/Hall-D/detector/fdc/conductive_tape], [http://www.jlab.org/Hall-D/detector/fdc/cond_tape/res2d.pdf ball counting hist.#1], [http://www.jlab.org/Hall-D/detector/fdc/cond_tape/resprof.pdf ball counting hist.#2]
+
#* Test results [http://www.jlab.org/Hall-D/detector/fdc/conductive_tape], [http://www.jlab.org/Hall-D/detector/fdc/cond_tape/res2d.pdf ball counting hist.#1], [http://www.jlab.org/Hall-D/detector/fdc/cond_tape/res2dlogyplot.pdf ball counting hist.#2], [http://www.jlab.org/Hall-D/detector/fdc/cond_tape/resprof.pdf ball counting hist.#3]
 
#* Procedure changes
 
#* Procedure changes
 
# Engineering (Bill)
 
# Engineering (Bill)

Revision as of 11:45, 16 August 2012

August 16, 2012 FDC meeting

Agenda

  1. Cathode production Construction Tracking (Dave)
  2. Cathode corrosion
    • Status [1]
    • Possible procedure changes
  3. Conductive tape technology
  4. Engineering (Bill)
    • Cathode strong-back
    • Other: epoxy tests
  5. Electronics (Chris, Nick)
    • PCBs
  6. TDR, pages 132-145 (Lubomir)
  7. Other